Executive Summary

Autodesk makes a different case for physical AI than the previous three vendors. It does not talk about world models, compute, or an arms race in solver accuracy. Its argument is that if data flows continuously across design, make and operate, that continuity becomes context nobody else has, and that context is worth more than any single model. At Autodesk University from 15 to 17 September 2026, that argument was made concrete as three industry clouds plus one intelligence layer: Forma for architecture and infrastructure, Fusion for design and manufacturing, Flow for media and entertainment, with a next-generation Autodesk Assistant above them.

This report makes five arguments.

First, Autodesk physical AI is project intelligence, not physics solving. Chief executive Andrew Anagnost put it directly: the future of AI for the built world will not belong to the company with the best single model but to the platform that combines the richest context with the right models. That sentence describes a trade-off accurately. Autodesk does not build frontier models; it turns forty years of industry data into constraints on models.

Second, the financial profile is one of the healthiest growth combinations among the four. Second quarter fiscal 2027, ended 31 July 2026, produced 2.046 billion dollars of revenue, up 16 percent as reported and 14 percent in constant currencies, with billings of 1.854 billion, a 41 percent non-GAAP operating margin, non-GAAP earnings per share of 3.30 dollars and free cash flow of 561 million dollars, up 24 percent. Full-year guidance was raised to 8.295 to 8.345 billion dollars of revenue and 12.52 to 12.60 dollars of non-GAAP earnings per share.

Third, the growth engine is AECO rather than manufacturing. Second quarter AECO revenue was 1.029 billion dollars, up 17 percent, half of total revenue. AutoCAD and AutoCAD LT contributed 500 million, up 14 percent, manufacturing 385 million, up 15 percent, and media and entertainment 92 million, up 15 percent. Structurally, Autodesk resembles a construction and infrastructure software company plus a mainstream CAD company more than an industrial CAE company.

Fourth, simulation is attached capability here, not core competence. Fusion includes structural, thermal and modal simulation, but they serve design and manufacturing flow and do not compete for professional CAE seats against SIMULIA, Ansys or COMSOL. That determines the role Autodesk can play in physical AI: the data and process side, not the physical correctness side.

Fifth, the MaintainX acquisition is a strategic turn. Completed on 3 August 2026, MaintainX anchors a newly created Autodesk Operations Solutions business and extends the company from design and make into operate. This is the first time it genuinely acquires real-time data from the operating phase of assets, which is the last missing piece in the project intelligence loop. The consideration is on the record: the 28 May 2026 announcement valued the all-cash transaction at approximately 3.6 billion dollars, and the second-quarter Form 10-Q states a preliminary purchase consideration of about 3.53 billion dollars net of cash acquired, financed with cash on hand, a 364-day term loan facility and short-term unsecured commercial paper.

Evidence grading. Quarterly reports and press releases are primary. Product previews at Autodesk University 2026 are announced but undelivered, with most capabilities described as available in 2027. Customer cases, such as a large retailer adopting Forma and Tandem, are self-reported without quantified results.

Company Overview

Autodesk, Inc. is headquartered in San Francisco, trades on Nasdaq as ADSK, and closes its fiscal year on 31 January. Fiscal 2027 therefore ends on 31 January 2027, which means coverage that abbreviates the second quarter of fiscal 2027 as the second quarter of 2026 invites confusion with the calendar year.

Results are disclosed on two dimensions. By product type: Design 1.708 billion dollars, Make 244 million and Other 94 million. By product family: AECO 1.029 billion, AutoCAD and AutoCAD LT 500 million, manufacturing 385 million, media and entertainment 92 million and Other 40 million.

By geography, the Americas contributed 898 million dollars, up 14 percent, EMEA 804 million, up 19 percent as reported and 13 percent in constant currencies, and APAC 344 million, up 14 percent. The three regions grew at similar rates, which indicates demand is global rather than dependent on one market.

On financial quality, the GAAP operating margin was 29 percent, up four points, and the non-GAAP margin 41 percent, up two points. GAAP earnings per share were 2.33 dollars and non-GAAP 3.30. Operating cash flow was 575 million, up 25 percent, and free cash flow 561 million, up 24 percent. Deferred revenue was 4.258 billion, up 11 percent, unbilled deferred revenue 3.175 billion, down 8 percent, remaining performance obligations 7.433 billion, up 2 percent, and current remaining performance obligations 5.245 billion, up 12 percent.

That cluster of contract figures needs explanation because it looks contradictory. Remaining performance obligations grew only 2 percent while the unbilled portion fell 8 percent. The company attributes this to a sustained programme of reducing multi-year discounts, including winding down multi-year maintenance-to-subscription renewals. In plain terms, it gave up contract value obtained through deep discounting in exchange for better long-term price realisation. Whether that was right will be visible over the next four quarters in annual recurring revenue and unit pricing.

Key Events in 2026

In March the company reported fiscal 2026 results, which this report does not rely on because primary data comes from the second quarter of fiscal 2027.

On 3 August, the MaintainX acquisition closed, bringing about 45 million dollars of transaction expenses and margin dilution in fiscal 2027, and anchoring the new Autodesk Operations Solutions business.

On 27 August the second quarter of fiscal 2027 was reported and full-year guidance was raised.

From 15 to 17 September, Autodesk University 2026 took place in Las Vegas and laid out the roadmap for three industry clouds and the next-generation Assistant.

On 6 October, Autodesk named Diana Colella executive vice president of its architecture, engineering and construction business, succeeding Amy Bunszel, who announced her retirement and stays with the company through 2 November to support the transition. Colella keeps the media and entertainment business until a successor is found. The handover covers the business line that produced roughly half of fiscal 2026 revenue, so the leadership change touches the main growth engine rather than a side segment.

On 21 October, at NVIDIA GTC Berlin, Autodesk announced plans to connect NavPack with NVIDIA PhysicsNeMo and NVIDIA Warp, extending the model architectures NavPack supports and enabling GPU-accelerated parts of the workflow for customers with compatible hardware.

Three Common Misreadings

Misreading one: attributing the 16 percent growth to new business. The overwhelming majority comes from renewals and price increases on the existing subscription base. MaintainX contributed very little, since it consolidated from 3 August and the second quarter contained less than a month of it. Guidance language says the raise reflects higher underlying growth expectations plus the incremental contribution from MaintainX.

Misreading two: reading slower remaining performance obligations as weakening demand. The 2 percent growth is the intended result of cutting multi-year discounts. In the same quarter, current remaining performance obligations grew 12 percent, revenue grew 16 percent and billings grew 10 percent. All three point to healthy demand.

Misreading three: classifying Autodesk as a physical AI company. Its own 2026 language is AI for the built world, project intelligence, and Design and Make. It does not use the term physical AI. Chinese coverage places it among physical AI players, which is an external classification and differs from the company's self-positioning.

Technology

Three Industry Clouds: Data Continuity Is the Core Asset

The most important strategic move at Autodesk University 2026 was repositioning Forma, Fusion and Flow as three industry clouds rather than three product lines. The division of labour runs as follows.

Forma connects architecture, engineering and construction. This release makes Civil 3D the newest Forma Connected Client, enabling reference-based interoperability between Forma and Revit so civil engineers, architects and planners work from shared project data. It adds Forma Street Design for early-stage roadway comparison, intelligent layout generation, indoor daylight analysis and a site design experience that switches freely between two and three dimensions.

Fusion connects product design, engineering, manufacturing and production. It adds AutoTimeline, which builds a feature tree for imported models; AutoAssemble, which creates assembly constraints automatically; Autodesk System Modeler, a low-code automation engine that can select parts, configure machines, generate toolpaths and learn from user adjustments; and automatic CAM programming.

Flow connects media and entertainment workflows.

The technical commonality is one data model running through design, manufacturing and operations. That is where Autodesk differs from Dassault, whose 3DEXPERIENCE does the same thing but heavier, and from Siemens, whose Teamcenter strength is in the bill of materials. Autodesk data model is lighter and reaches far more small and mid-sized customers.

The Next-Generation Autodesk Assistant: From In-Tool to Cross-Project

This is the core announcement of Autodesk University 2026. The current state is that Autodesk Assistant is generally available in Fusion, Forma and Flow, working inside each tool. The next generation is designed to work across products, projects and teams.

Three components make it up.

Personal Pulse surfaces prioritised issues and insights across projects. It is effectively a project health dashboard generated by AI rather than configured by hand.

Assistant Spaces provides a focused environment where teams and their agents investigate a problem and see downstream effects. When a structural change occurs in a building, for example, it can identify impacts on fabrication, schedule, cost, construction sequencing and operations.

Assistant Builder lets customers connect their own agents, tools and trusted partner services to Autodesk project context, with third-party agents supported through the Design and Make Marketplace.

Behind all three sits the Autodesk AI Orchestrator, which evaluates models against task requirements including accuracy, speed, security and cost. That design matters because it means Autodesk is not bound to a single model vendor and treats models as replaceable resources.

One timing point must be flagged. The next-generation Assistant was previewed at Autodesk University 2026, with broader availability planned for 2027 and a standalone cross-product experience also planned for 2027.

Project Bernini: The Boundaries of a Foundation Model

Project Bernini is Autodesk AI research positioned as a geometry foundation model. Three constraints appear in public information: training data comes from publicly licensed sources, outputs are not available for commercial use, and the project is open to the AI community.

Technically it accepts voxels, sketches and point clouds in addition to text and images, and produces fully realised and detailed three-dimensional objects rather than simplified shapes, in under a minute.

Its meaning for physical AI is that if geometric generation reaches engineering-grade precision, the path from intent to manufacturable model compresses sharply. Today, however, Bernini is a research project rather than a product, and its licence restricts commercial use.

NavPack and the Planned NVIDIA Integration

NavPack is the most physically concrete piece of Autodesk's predictive engineering work. It runs predictive models trained on a customer's own simulation history, so that a designer working in Alias can evaluate aerodynamic consequences while still shaping geometry, with full-fidelity simulation retained for model training and final validation. The 21 October 2026 GTC Berlin announcement adds NVIDIA PhysicsNeMo for model architectures and NVIDIA Warp for GPU-accelerated execution, with Bentley already using NavPack in its vehicle design workflow. Two limits should be stated. The integration is planned rather than shipped, and the acceleration path requires compatible NVIDIA hardware, so the addressable installed base is narrower than the software base. What the design does establish is the division of labour: Autodesk supplies the parametric environment and the predictive toolset, NVIDIA supplies the model structures and the accelerated runtime.

The Real Position of Simulation

This must be stated plainly. Autodesk simulation capability sits mainly inside Fusion, covering common structural, thermal and modal conditions to support fast validation within design and manufacturing flow. It has neither the standalone solver brands and validation depth of SIMULIA and Ansys nor an independent multiphysics product line.

Two consequences follow. The good side is that Autodesk does not have to compete head-on with professional CAE vendors; it sells simulation as part of a design flow with low decision cost for customers. The bad side is that it has no voice on physical correctness, and when a customer needs signoff-grade accuracy it still buys Ansys, SIMULIA or COMSOL.

Autodesk physical AI is therefore a process intelligence route. It makes design intent become manufacturable and buildable faster, without guaranteeing the accuracy of physical results. That is an honest but limited positioning.

Layering Credibility

Verifiable: financial data; the MaintainX closing date, transaction expenses and disclosed consideration; the positioning of the three industry clouds and the Forma Connected Client roster; current availability of Autodesk Assistant; the AEC leadership change; and the licence restrictions on Project Bernini.

Partially verifiable: the three next-generation Assistant capabilities, which have demonstrations but no customer deployment data; reference-based interoperability between Forma and Revit, which has product documentation but no independent evaluation; the effect of project intelligence, where customer statements are self-reported; and the NavPack integration with PhysicsNeMo and Warp, which has an announcement but no shipped release or performance measurement.

Not verifiable: geometric accuracy metrics for Bernini; the model routing effectiveness of the Autodesk AI Orchestrator; and whether 2027 delivery commitments will be met.

Product and Commercial Model

Autodesk sells subscriptions priced on a mix of seats and usage, with a multi-year trend of raising prices and cutting discounts.

Revenue structure. AECO is half the business and the growth engine at 17 percent. AutoCAD and AutoCAD LT are about a quarter and serve as both cash cow and volume entry point. Manufacturing and media and entertainment at 15 percent each are supplementary. The implication is that Autodesk AI investment first serves construction and infrastructure customers, with manufacturing customers benefiting secondarily.

Pricing change. The company is explicitly reducing multi-year discounts, including winding down multi-year maintenance-to-subscription renewals. In the short term, unbilled deferred revenue fell 8 percent and remaining performance obligations grew only 2 percent. Over time, better price realisation should raise value per customer.

Channels. Direct sales plus channel partners dominate, with small and mid-sized customers reached through e-commerce and partners. A sales reorganisation was underway in 2026 and the company describes it as proceeding as expected.

The addition of operations. MaintainX adds a new pricing dimension: operations software subscribed per facility or asset. For the first time Autodesk can sell three stages to the same customer, namely design through Forma and Fusion, make through Fusion, and operate through MaintainX. Customer lifetime value rises, but cross-selling execution becomes harder.

Pricing opacity. Autodesk does not publish list prices by product, and annual reports disclose only revenue structure. That makes it impossible from outside to assess whether AI features are separately charged. Public information suggests AI is bundled into existing subscriptions rather than sold as a separate SKU, which leads to an important judgment: its AI is currently a retention instrument rather than a revenue line.

Competitive Landscape

Against Bentley Systems, the contest is direct in AECO but the customer base differs. Bentley is strong in the full lifecycle of transport, water and energy infrastructure through iTwin, while Autodesk is strong in building design and construction through Revit and Forma. The two meet head-on in digital twins, but Bentley customers skew to asset owners and operators while Autodesk customers skew to designers and contractors. MaintainX pulls Autodesk into Bentley operating territory.

Against Dassault Systemes, the contest is offset at the product lifecycle level. The 3DEXPERIENCE platform targets large manufacturers in aerospace and automotive, while Autodesk targets a broader mid-market. Dassault is far deeper in simulation; Autodesk is stronger in usability and channel reach.

Against Siemens, competition occurs in digital manufacturing and overlaps little in electronic design or professional simulation. Siemens also owns automation hardware, which Autodesk lacks.

Against Adobe and Unity in media and entertainment, Flow competitors sit outside industry. The line contributes little to physical AI but provides stable cash flow and brand equity.

Against AI-native design startups, the near-term threat is small and the long-term threat is real. Bernini shows Autodesk is aware, but restricting output to non-commercial use also shows it has not decided how to turn generative geometry into revenue.

Against NVIDIA, the relationship is optional dependency rather than competition. Autodesk AI is built mainly on decades of project data plus third-party models, without deep binding to a single compute vendor. That grants flexibility but also means it does not receive the joint engineering support that NVIDIA gives to closer partners.

Financing and Capital Structure

Autodesk is a mature public company whose capital activity centres on buybacks and acquisitions.

Buybacks. The company has run large repurchase programmes for years, and they are a material contributor to earnings per share growth. The gap between the fiscal 2027 GAAP guidance range of 7.89 to 8.72 dollars and the non-GAAP range of 12.52 to 12.60 reflects share-based compensation and acquired intangible amortisation.

Acquisitions. The MaintainX acquisition closed on 3 August 2026. Two disclosure levels exist and they should not be merged. The 28 May 2026 announcement valued the all-cash transaction at approximately 3.6 billion dollars, described MaintainX as expected to exceed 135 million dollars of annualised recurring revenue in calendar 2026 with growth above 50 percent, and placed it in a new Autodesk Operations Solutions unit alongside Tandem, Flexsim, Fusion Operations and Factory Design Utilities. The second-quarter Form 10-Q then states a preliminary purchase consideration of about 3.53 billion dollars net of cash acquired, funded with cash on hand, borrowings under a 364-day term loan facility and borrowings under a short-term unsecured commercial paper programme, and adds that a preliminary purchase price allocation is not yet practicable to disclose. The transaction brought about 45 million dollars of transaction expenses and dilutes the fiscal 2027 margin. This is by a wide margin the largest acquisition in Autodesk's history, which changes the capital profile discussion below: previous deals filled technology gaps in cloud collaboration, construction management and generative AI at small scale, and this one moves the balance sheet.

Cash flow. Second quarter free cash flow was 561 million dollars, up 24 percent, with full-year guidance of 2.725 to 2.75 billion after about 70 million dollars of capital expenditure and 45 million of transaction expenses. That funds both buybacks and acquisitions.

Key financial sequence, GAAP unless noted. Second quarter fiscal 2027 revenue 2.046 billion dollars, up 16 percent; billings 1.854 billion, up 10 percent; GAAP operating margin 29 percent and non-GAAP 41 percent; GAAP earnings per share 2.33 dollars and non-GAAP 3.30; operating cash flow 575 million and free cash flow 561 million. Full-year guidance: billings 8.575 to 8.65 billion, revenue 8.295 to 8.345 billion, GAAP operating margin 25 to 27 percent, non-GAAP about 39 percent, GAAP earnings per share 7.89 to 8.72 dollars, non-GAAP 12.52 to 12.60, free cash flow 2.725 to 2.75 billion. Third quarter guidance: revenue 2.125 to 2.14 billion, GAAP earnings per share 1.57 to 1.87 dollars and non-GAAP 3.04 to 3.09.

Valuation note. A 41 percent non-GAAP operating margin is high for this industry, but it excludes share-based compensation, which is a real cost for software companies. The GAAP figure of 29 percent is more conservative. Fiscal 2027 also contains MaintainX dilution, which needs stripping out in year-on-year comparison.

DISCREPANCIES

1. The 16 percent and 14 percent growth rates are two bases for the same quarter. (Source grade: OFFICIAL) Reported growth was 16 percent and constant-currency growth 14 percent, the difference coming from a weaker dollar, which lifted EMEA reported growth to 19 percent against 13 percent in constant currencies. Some coverage cites only 16 percent. This report shows both and uses constant currencies for operating judgment.

2. Remaining performance obligations at 2 percent, current RPO at 12 percent and unbilled deferred revenue at minus 8 percent appear contradictory. (Source grade: OFFICIAL) The company attributes the pattern to deliberately reducing multi-year discounts and winding down multi-year maintenance-to-subscription renewals. The three measures differ in scope, since total RPO includes multi-year unbilled amounts while current RPO covers only the next twelve months. This report lists all three and explains the driver.

3. Physical AI is an external classification rather than the company position. (Source grade: MEDIA versus OFFICIAL) Chinese coverage often lists Autodesk among physical AI players, while the company's 2026 language is AI for the built world, project intelligence, and Design and Make, without using the term physical AI. This report keeps the company framing and explains its position on the physical correctness axis in the competitive section.

4. The next-generation Autodesk Assistant is described as released. (Source grade: OFFICIAL versus MEDIA) The Autodesk University 2026 language is that it was previewed, with broader availability planned for 2027 and a standalone cross-product experience also planned for 2027. Some coverage describes it as launched or available. What is generally available today is the in-product Autodesk Assistant, which is a different generation.

5. Fiscal 2027 and calendar 2027 are conflated. (Source grade: OFFICIAL) The Autodesk fiscal year ends on 31 January, so fiscal 2027 ends on 31 January 2027. Reports referring to the second quarter of 2026 mean the second quarter of fiscal 2027, ended 31 July 2026. This report always writes fiscal 2027 second quarter with the calendar interval.

6. Bernini commercial availability is overstated. (Source grade: OFFICIAL) Project Bernini is trained on publicly licensed data, the company states its outputs are not available for commercial use, and the project is open to the AI community. Some coverage describes it as a generative design product. This report treats it as a research project.

7. The MaintainX consideration has two disclosed figures and neither is the full deal economics. (Source grade: OFFICIAL) The 28 May 2026 announcement gives approximately 3.6 billion dollars for the all-cash transaction, while the second-quarter Form 10-Q gives a preliminary purchase consideration of about 3.53 billion dollars net of cash acquired. The two differ because one is the headline transaction value and the other is the net-of-cash accounting figure, so they are not in conflict. What is still not disclosed is the purchase price allocation, which the company states is impracticable to determine at this stage, and the revenue and cost synergies for the operations business. This report uses both disclosed figures with their basis stated, and treats the allocation and synergies as open.

Risks and Diligence Gaps

AI capability is not yet monetised. Public information indicates AI features are bundled into existing subscriptions with no separate SKU or price. The return on AI investment can therefore only show up through retention and price increases and cannot be measured separately. If customers judge the value insufficient, renewal resistance rises.

The consequences of slower RPO growth remain to be seen. Cutting multi-year discounts is strategically sound but compresses contract value growth in the short term. If annual recurring revenue and unit pricing do not rise accordingly in 2027, the choice will be questioned.

MaintainX integration risk is material. Operations software for maintenance and enterprise asset management differs sharply from design software in customer profile, sales motion and service model. It is Autodesk first entry into that field, and execution risk is not small. Transaction expenses and margin dilution are already reflected in guidance.

AECO concentration is high. AECO is half of revenue and the fastest-growing part. Construction and infrastructure investment is sensitive to interest rates and public spending cycles, so any downturn drags overall growth.

The simulation gap shows up with high-end customers. When a customer needs signoff-grade multiphysics accuracy, Autodesk cannot supply it and must work alongside third-party solvers. That caps its reach in aerospace and energy scenarios.

Diligence gap list, ordered by importance. First, actual usage of AI features and their quantified contribution to retention and pricing. Second, MaintainX revenue and customer overlap with the existing design and operations base, since the disclosed figures are a purchase price rather than a business trajectory. Third, the 2027 delivery scope and pricing model for the next-generation Assistant. Fourth, customer counts and project scale for Forma and Tandem digital twins. Fifth, the split of AECO revenue between building construction and infrastructure, which determines cyclical sensitivity. Sixth, the commercialisation path for Project Bernini and whether a commercially licensed version will appear. Seventh, completion timing of the sales reorganisation and its effect on fiscal 2028. Eighth, China revenue share and localisation strategy. Ninth, the purchase price allocation and the synergy assumptions for the operations business, neither of which the company has published.

Composite Assessment

techScore 7.0. Data continuity across three industry clouds is a real asset, the model-agnostic design of the AI Orchestrator is the right architectural choice, and Bernini has research value in geometric generation. The deduction reflects insufficient simulation depth, Bernini's non-commercial licence, the undelivered next-generation Assistant and the fact that the NavPack integration with PhysicsNeMo and Warp is announced rather than shipped.

bizScore 8.0. Second quarter fiscal 2027 revenue growth of 16 percent, a 41 percent non-GAAP operating margin, free cash flow up 24 percent and raised full-year guidance demonstrate strong execution. The deduction reflects AI not being separately monetised, slower RPO growth and MaintainX margin dilution.

fundScore 8.0. Full-year free cash flow guidance of 2.725 to 2.75 billion dollars, sustained buybacks and a solid balance sheet support the funding of a 3.53 billion dollar net acquisition. The deduction reflects that the largest acquisition in Autodesk's history is financed partly with a 364-day term loan and commercial paper, which introduces refinancing and interest cost exposure, and that there is no strategic capital binding behind the physical AI programme.

productScore 7.5. From Forma, Fusion and Flow to MaintainX, the portfolio spans design, make and operate, with usability and channel as advantages. The deduction reflects weak professional simulation capability and a cross-product experience that waits until 2027.

marketScore 8.0. AECO share, the entry position of AutoCAD and a customer base in the hundreds of thousands are a moat. The deduction reflects a weak manufacturing presence and no voice on physical correctness.

References

  1. Autodesk second quarter fiscal 2027 results, quarter ended 31 July 2026, published 27 August 2026: revenue 2.046 billion dollars, up 16 percent and 14 percent in constant currencies; billings 1.854 billion, up 10 percent; GAAP operating margin 29 percent and non-GAAP 41 percent; GAAP earnings per share 2.33 dollars and non-GAAP 3.30; operating cash flow 575 million and free cash flow 561 million
  2. Segment data from the same filing: Design 1.708 billion dollars, up 16 percent; Make 244 million, up 26 percent; Other 94 million, down 3 percent; AECO 1.029 billion, up 17 percent; AutoCAD and AutoCAD LT 500 million, up 14 percent; manufacturing 385 million, up 15 percent; media and entertainment 92 million, up 15 percent
  3. Geographic data from the same filing: Americas 898 million dollars, up 14 percent; EMEA 804 million, up 19 percent and 13 percent in constant currencies; APAC 344 million, up 14 percent
  4. Contract metrics from the same filing: deferred revenue 4.258 billion dollars, up 11 percent; unbilled deferred revenue 3.175 billion, down 8 percent; remaining performance obligations 7.433 billion, up 2 percent; current remaining performance obligations 5.245 billion, up 12 percent, together with the explanation about reducing multi-year discounts
  5. Autodesk fiscal 2027 guidance: billings 8.575 to 8.65 billion dollars; revenue 8.295 to 8.345 billion; GAAP operating margin 25 to 27 percent; non-GAAP about 39 percent; GAAP earnings per share 7.89 to 8.72 dollars; non-GAAP 12.52 to 12.60; free cash flow 2.725 to 2.75 billion including about 45 million dollars of MaintainX transaction expenses; third quarter revenue guidance of 2.125 to 2.14 billion
  6. Autodesk blog, 5 things to know about Autodesk Q2 FY27 results: revenue 2.05 billion dollars, AECO and construction driving performance, MaintainX closing on 3 August and anchoring the Operations Solutions business, and a large retailer adopting Forma and Tandem for a North American digital twin portfolio
  7. Autodesk press release, Autodesk Advances Agentic AI in Its Three Industry Clouds, 15 September 2026 at Autodesk University 2026: the three industry clouds of Forma, Fusion and Flow; Autodesk Assistant generally available in many products; the next-generation Assistant preview covering Personal Pulse, Assistant Spaces, Assistant Builder and the Autodesk AI Orchestrator; broader availability and a standalone experience planned for 2027
  8. Forma capabilities from the same release: Civil 3D as the newest Forma Connected Client, reference-based interoperability between Forma and Revit, Forma Street Design, intelligent layout generation, indoor daylight analysis, Forma Bid, Workflow Studio, the Daily Log Agent and Drawing Compliance Review planned for early 2027
  9. Fusion capabilities from the same release: AutoTimeline, AutoAssemble, Autodesk System Modeler and automatic CAM programming
  10. Chinese coverage of Autodesk University 2026: AI updates across Forma, Fusion, Revit and Flow, including a document agent, a submission review agent and a tender proposal agent
  11. Public information on Project Bernini from the Autodesk University keynote: a geometry foundation model trained on publicly licensed data, not available for commercial use, open to the AI community, accepting voxels, sketches and point clouds and producing fully realised three-dimensional objects in under a minute
  12. Executive statements: Andrew Anagnost, president and chief executive, on the future of AI for the built world belonging to the platform that combines the richest context with the right models, and on the constraint being capacity rather than ideas; Raji Arasu, chief technology officer, on trust, connectivity and scale; Janesh Moorjani, chief financial officer, on the sales reorganisation and guidance
  13. Autodesk press release, Autodesk to acquire MaintainX, advancing unified platform in operations, 28 May 2026: all-cash transaction valued at approximately 3.6 billion dollars; the formation of Autodesk Operations Solutions bringing together Tandem, Flexsim, Fusion Operations and Factory Design Utilities; MaintainX expected to exceed 135 million dollars of annualised recurring revenue in calendar 2026 with growth above 50 percent; funding from cash on hand and debt financing; closing expected later in fiscal 2027
  14. Autodesk second quarter fiscal 2027 Form 10-Q, filed 28 August 2026, Subsequent Events: acquisition of MaintainX on 3 August 2026 for preliminary purchase consideration of approximately 3.53 billion dollars net of cash acquired; preliminary purchase price allocation impracticable to disclose; financing through cash on hand, a 364-day term loan facility and a short-term unsecured commercial paper programme
  15. Autodesk press release, Autodesk names Diana Colella to lead architecture, engineering and construction business, 6 October 2026: Colella named executive vice president of the AEC business, succeeding Amy Bunszel who remains through 2 November 2026 to support the transition; continued oversight of media and entertainment while a successor is sought
  16. Autodesk News, Autodesk and NVIDIA accelerate engineering feedback loop for automotive designers, 21 October 2026: planned integration of NavPack with NVIDIA PhysicsNeMo and NVIDIA Warp to develop additional AI model architectures and GPU-accelerated workflows for customers with compatible hardware
This report is compiled from public sources for informational purposes only and does not constitute investment advice. Data is current as of 2 November 2026; please refer to company announcements and periodic reports.

Related reports66

This report is compiled from public sources. It is for reference only and does not constitute investment advice. Data is current as of the publication date; please refer to the company’s official filings.